u23f0 Hours left to lock in the savings. Learn future-ready AI, data & product skills. Act now before the offer ends!
Pantech eLearning
school
Pantech.
Home > Courses > EV & Autonomous Design

Renewable Energy Systems for EV Applications

Accelerate your Career

Learn how renewable energy systems integrate with electric vehicles (EVs). Explore solar, wind, and smart grid solutions for sustainable mobility.

6 Modules
with Certifications
8:00 Hours
of Recorded Content
5.0 Ratings
by 1245 Learners
English
Language
Paid Course
Get this Course @ ₹2,499
1245 enrolled in this course

Renewable Energy Systems for EV Applications

Renewable energy technologies are transforming the future of electric mobility and sustainable power generation. This specialist-level course provides comprehensive training in solar photovoltaic systems, power electronics, maximum power point tracking (MPPT), inverter design, wind energy integration, and renewable energy applications for electric vehicles. Through engineering concepts, MATLAB-Simulink simulations, business case studies, and practical design methodologies, learners will develop the expertise required to design and implement renewable energy systems for real-world industrial and EV applications.
MASTERING THE DATA SCIENCE LIFECYCLE

Comprehensive Syllabus Outline

A comprehensive curriculum designed to take you from beginner to professional.

M1

Module 1 - Solar PV System Fundamentals

Introduction to Solar PV System
Fundamentals of MATLAB - Simulink
Solar PV Panels and Mounting Structure
Types and selection of solar modules
Selection of Tilt angle, Grounding system
PV Shading Effects

M2

Module 2 - Power Electronics for Renewable Energy Systems

Power Converter Design
Gate Drive Circuit Design
Gate Drive Circuit Design
Sensor Circuit Design

M3

Module 3 - MPPT and Energy Management Techniques

MPPT Basics
MPPT Design with PO Algorithm
MPPT Design with IC Algorithm
MPPT Design with Fuzzy Logic

M4

Module 4 - Inverter Design and PV System Engineering

Inverter Design

M5

Module 5 - Renewable Energy System Implementation and Applications

Solar PV System Business Case Study
Wind Energy Basics
Wind Energy Power System Design
Solar PV and Wind Energy System Integration

M6

Module 6 - EV and Renewable Energy Applications

Solar PV Powered Electric Vehicle System
Research Concepts in Renewable Energy System

Capstone Project

Integrated Renewable Energy Design Challenge

Synthesize your learning by building a complete, simulated renewable energy ecosystem designed specifically for EV charging applications.

A complete MATLAB/Simulink model of a Solar-PV powered EV charging station.
PROJECT

A complete MATLAB/Simulink model of a Solar-PV powered EV charging station.

Access hands-on simulation modules to master production level engineering challenges.

Detailed CAD-based Single Line Diagrams (SLD) for a commercial PV installation.
PROJECT

Detailed CAD-based Single Line Diagrams (SLD) for a commercial PV installation.

Access hands-on simulation modules to master production level engineering challenges.

Comparative analysis report on P&O vs Fuzzy Logic MPPT efficiency.
PROJECT

Comparative analysis report on P&O vs Fuzzy Logic MPPT efficiency.

Access hands-on simulation modules to master production level engineering challenges.

A technical and financial feasibility business plan for a 50kW hybrid wind-solar project.
PROJECT

A technical and financial feasibility business plan for a 50kW hybrid wind-solar project.

Access hands-on simulation modules to master production level engineering challenges.

Embedded control logic code for a solar charge controller using Arduino.
PROJECT

Embedded control logic code for a solar charge controller using Arduino.

Access hands-on simulation modules to master production level engineering challenges.

CORE TOOLING MASTERY

Tech Stack

Master the primary professional software development packages and workflow tools.

MATLAB
Simulink
CAD Design Tools
Arduino IDE
P&O / IC Algorithms
Fuzzy Logic Toolbox
DC-DC Power Converters
Power Electronics Simulation
Career Impact

After this Course, You will be Able to

Observe the real-world utility outcomes you gain after program completion.

Engineer and simulate high-efficiency solar PV systems for residential and industrial EVs.
Develop and deploy advanced MPPT controllers using P&O, IC, and Fuzzy Logic algorithms.
Design and size complex power electronic converters and gate driver circuits for renewable assets.
Architect hybrid solar-wind energy systems to maximize power reliability for mobility applications.
Conduct professional-grade technical and commercial feasibility studies for renewable energy projects.
Pass technical interviews for Renewable Energy and EV Design Engineer roles with confidence.

Course Stats

₹11.4 LPA

Average Salary

₹40 LPA

Highest Salary

125%

Salary Hike

5,300+

Job Vacancies

Key Features

Mentorship

Receive guidance and insights from industry experts

Hands-on Experience

Gain practical skills in a real-world cutting-edge projects.

Networking

Connect with professionals and peers in your field

Skill Development

Enhance your technical and soft skills

Career Advancement

Boost your resume with valuable experience

Dual Certificate

Get a certification to showcase your achievements
DIGITAL VERIFIABLE CREDENTIAL

Let Your Certificates Speak For You

Our certification formally validates your skill set in recruiter searches with unique QR code verification and LinkedIn-ready structures.

Unique Credential ID & QR Code
Recruiters can scan to instantly verify your project files, source repository, and official completion marks.

Linkedin Certified Recognition
Easily push to your Linkedin profile with 1-click credential linking to increase high-end corporate recruiter views.

Certificate Sample
Status
Verified

Where Our Learners Work

Our alumni are driving innovation at the world's most prestigious technology companies.

Flipkart
Freshworks
Juspay
Chargebee
Zoho
PayPal
PREMIER PLATFORM EXPERIENCE

Why Pantech?

An expert-crafted learning infrastructure built for technical fluency.

Industrial Expert Mentors

Direct guidance and weekly doubt clearing sessions hosted by hardware, embedded, and software engineering veterans.

24/7 Interactive Support

Ask coding doubts anytime on our student community workspace and receive instant assistance.

Self-Paced Learning Engine

Access lifetime recorded modules with adaptive pacing to balance academics and professional work.

Career Guidance Support

Exclusive resume review, mock interviews, and placement assistance from industry experts.

We are Accredited by

Our Awards & Achievements
Award 1
VERIFIED STUDENT REVIEWS

What Our Students Say

See how Pantech courses accelerated career transitions across India.

"d"
Student Pantech

Student Pantech

VERIFIED LEARNER

Get exclusive lifetime access to coursework, simulators, custom templates, and direct placement opportunities.

Need immediate counseling?

+91 8925533488/89

HAVE QUESTIONS?

Frequently Asked Questions

Find instant answers to all common questions about our technical certificate courses.

1.Who should enroll in this course?

Electrical, electronics, renewable energy, and EV engineering students, professionals, and researchers interested in sustainable energy systems.

2.Do I need prior knowledge of renewable energy systems?

Basic knowledge of electrical engineering concepts is recommended, although the course begins with foundational topics in solar PV systems.

3.Will this course include practical simulations?

Yes. The curriculum incorporates MATLAB-Simulink modeling, renewable energy system design exercises, business case studies, and practical engineering concepts.

4.What technologies are covered?

The course covers solar PV systems, power electronics, MPPT algorithms, inverter design, wind energy systems, Arduino integration, MATLAB-Simulink, CAD-based PV engineering, and EV-powered renewable energy applications.

5. skills relevant to the renewable energy and EV industry?

Yes. The course is designed to provide industry-oriented expertise in renewable energy engineering, hybrid power systems, solar EV integration, and sustainable technology development.

Pantech AI Assist
Pantech AI Assistant
Hi Welcome to Pantech. How can I help you today?